New electrical connections to the Cutty Sark

Cutty Sark

Project Brief

Following the devastating fire in 2007 that ravaged the Cutty Sark, the iconic maritime treasure located in Greenwich, London, there was much restoration work to be done. There was also a brief for the creation of a new visitors centre and restaurant to surround the Cutty Sark.

The project brief for UK Power Solutions was to design and supply a new electrical connection to this development, including the installation of a substation and the provision of heads for multiple metered supplies.

Project Management

Following acceptance of UK Power Solutions’ detailed proposal, a kick-off meeting with the client enabled the production of a critical path plan. The project was complicated by a long 900 metre off site route for cables, the imposition of limited timescales because of working hour restrictions due to the nature of this tourist site and tight control of road opening/closing notices, particularly where schools were located; making it essential that all project milestones were reached on time.

Project Delivery

The energisation of the electrical supply was completed on time and met with the overall project schedule, enabling the re-opening of the historic site to go ahead as planned.

Market Sectors

UK Power Solutions work in a wide range of market sectors. In addition to the Leisure sector we have carried out work on Commercial, Industrial, Housing and Education projects. We have also fulfilled a number of contracts in the renewable energy field, including biomass generation, solar farms and wind turbines.

No Obligation Proposal

For a no obligation proposal and outline design email sales@ukpowersolutions.co.uk or call us on 0845 2577105.

Cutty Sark UKPS case study

Click on image to download a printable PDF

High Voltage Connections for Cheltenham Racecourse
Residential Network Connections for Winterstoke Village
Menu